内容为:Precasting for Immersed Tunnel Segment
Roadway lanes in each direction : L=8.2Km, B=20.5m
Immersed tunnel : 3.7km
2 x Cable stayed bridge : 1.6km
4 x Approach bridges : 1.9km
2 x Bored tunnels : 1.0km
【目录】
Ⅰ. Project Overview
Ⅱ. Location
Ⅲ. Facts and figures
Ⅳ. Element Production
Ⅴ. Warping, Towing and Mooring
Ⅵ. Immersion Works
Ⅶ. General background items
Birds eye view
Formwork System (Kumkang Doka)
Obi Pre-Casting yard
Polyurea waterproofing membrane to outer walls and upper haunch
免责声明:BBS所有内容均为网友上传,仅供学习交流,如有侵权请通知我们删除。
简介
二维码(建议尺寸80*80)