ABSTRACT Firstly, the present situation and insufficiency of the supervision for domestic facility installation projects are analyzed. Facility project supervision through the control of quality, progress, cost and safety is proposed. Our supervision level for facility projects could be improved only if all of the quality, progress, cost and safety goals are emphasized, and "four controls, two supervision, one coordination" are achieved. The major three targets of quality, progress and cost are unification of opposites, and the control of these targets should be carried out simultaneously. Tianjin Subway # 1 Line facility installation project is taken as an example in this papre. The target control methods and their application for facility project supervision are also described. Key word: Equipment Installation Project; Supervision: Major Three Control Targets; Tianjin Subway # 1 Line |
帮你翻完了。现在可以提点意见了吧? 1.行文要严谨。有首先,就要有其次,再次,。。。最后。 我从头看到尾,只有首先,没有后来。 2.成本,投资在你的文章里混合出现,不该。 投资是从业主的角度看到的项目成本,把投资和成本放一起, 让人不知道你是业主,监理还是承包。 3.短短一段,你一会儿四控,一会儿三大目标控制, 让人不知你到底要“控”什么。 |
谢谢版主!对您提的意见我虚心接受,由于我刚毕业对实践还不太了解,以后还请多多指教。我觉得您说的特别有道理,如果您有兴趣,能不能看看我写的论文,然后帮我修改一下。我刚发的内容摘要还是老师帮我改的了,改过以后还这么差,可想而知,老师的水平也不过如此,还不如您呢! |
北京 | 工程监理
2 关注
1 粉丝
3 发帖
0 荣誉分
∨
简介
二维码(建议尺寸80*80)