[资料]国家电网公司业主项目部标准化管理手册2014

发表于2016-04-17     9194人浏览     11人跟帖     总热度:402  

扫码加入筑龙学社  ·  建筑施工微信群 为您优选精品资料,扫码免费领取
分享至

分享到微信朋友圈 ×

打开微信"扫一扫",扫描上方二维码
请点击右上角按钮 ,选择 

点评+2

  • 发表于 2017-09-11     给我传一份2014版国家电网业主项目部标准化管理手册

  • 发表于 2016-04-21     谢谢了,收藏了

 发表于2016-04-17   |  只看该作者       筑龙币+10

2

目录

编制说明

国家电网公司业主项目部标准化管理手册2014_1 1  业主项目部设置·································································· 1

1.1  业主项目部组建··································································· 1

1.2  业主项目部工作职责····························································· 2

1.3  业主项目部重点工作与关键管控节点·········································· 7

国家电网公司业主项目部标准化管理手册2014_2 2  项目管理············································································ 9

2.1  管理工作内容与方法····························································· 9

2.2  管理流程·········································································· 11

2.3  管理依据·········································································· 19

国家电网公司业主项目部标准化管理手册2014_3 3  安全管理··········································································· 21

3.1  管理工作内容与方法···························································· 21

3.2  管理流程·········································································· 23

3.3  管理依据·········································································· 30

国家电网公司业主项目部标准化管理手册2014_4 4   质量管理········································································· 31

4.1  管理工作内容与方法···························································· 31

4.2  管理流程·········································································· 33

4.3  管理依据·········································································· 37

国家电网公司业主项目部标准化管理手册2014_5 5  造价管理··········································································· 39

5.1  管理工作内容与方法···························································· 39

5.2  管理流程·········································································· 40

5.3  管理依据·········································································· 45


 

国家电网公司业主项目部标准化管理手册2014_6 6  技术管理············································································ 46

6.1  管理工作内容与方法···························································· 46

6.2  管理流程·········································································· 47

6.3  管理依据·········································································· 50

国家电网公司业主项目部标准化管理手册2014_7 7  评价机制··········································································· 52

7.1  业主项目部综合评价···························································· 52

7.2  监理单位及其监理项目部综合评价··········································· 53

7.3  施工单位及其施工项目部综合评价··········································· 53

7.4  设计单位综合评价······························································· 54

7.5  物资供应商履约评价···························································· 54

7.6  管理依据·········································································· 55

 

附录A  名词术语··········································································· 56

附录B  标准化管理模板··································································· 58

B.1  业主项目部设置部分··························································· 58

SZ1:业主项目部组织机构成立通知·········································· 58

B.2  项目管理部分···································································· 60

XM1:建设管理纲要···························································· 60

XM2:工程项目进度实施计划·· 64

XM3:项目设计计划·· 65

XM4:会议纪要模板·· 66

XM5:文件收发记录表·· 68

XM6:工程建设月报·· 69

XM7:工程建设管理总结·· 81

B.3  安全管理部分···································································· 82

AQ1:输变电工程安全管理总体策划框架要求·· 82

AQ2:业主项目部安全管理台账·· 85

AQ3:输变电工程安全施工作业票(B票)·· 86

AQ4:安全文明施工奖励记录·· 87

AQ5:安全文明施工处罚记录·· 87

AQ6:输变电工程项目安全文明施工标准化管理评价报告·· 88

AQ7:施工分包计划一览表·· 91

AQ8:施工分包人员动态信息汇总表·· 91

AQ9:施工分包单位考核情况一览表·· 92

AQ10:现场应急处置方案编制模板·· 93

AQ11:安全检查问题整改通知单·· 101

AQ12:安全检查问题整改反馈单·· 102

B.4  质量管理部分·· 103

ZL1:工程质量通病防治任务书·· 103

ZL2:质量检查问题整改通知单·· 106

ZL3:质量检查问题整改反馈单··· 107

ZL4:输变电工程标准工艺应用率及应用效果评分表---------------

ZL5:输变电工程标准工艺管理及实施效果评价表------------------

B.5  造价管理部分·· 108

ZJ1:工程量管理文件·· 108

ZJ2:工程设计变更(签证)审批单·· 108

ZJ3:竣工结算文件·· 108

B.6  技术管理部分·· 108

JS1:技术标准问题及标准间差异汇总表·· 108

B.7  评价机制部分·· 109

PJ1:业主项目部综合评价表·· 109

PJ2:监理项目部综合评价表·· 113

PJ3:施工项目部综合评价表·· 115

PJ4:变电站工程设计质量评价表·· 118

PJ5:线路工程设计质量评价表·· 123

PJ6:供应商违约情况表·· 128


编制说明

《国家电网公司业主项目部标准化管理手册》是按照“大建设”体系建设方案,结合国家电网公司基建最新通用制度标准要求,在2013年出版的《国家电网公司业主项目部标准化工作手册》基础上,经过广泛征求各单位意见修编完成。

本手册修编体现了四个特点:一是全面总结了国家电网公司系统业主项目部标准化建设经验,并紧密结合公司基建最新管理制度标准要求;二是手册内容适用于110(66)kV及以上输变电工程,35kV输变电工程及新建变电站同期配套10kV送出线路工程参照执行;三是手册正文总体继续保持按五大专业描述的架构,对相关内容、流程等进行更新、优化、完善;四是手册内容突出业主项目部重点工作及主要管控节点、主要工作流程及管控记录表应用等有关要求。

本手册主要包括以下三大方面内容:

(1)业主项目部设置。明确了业主项目部的定位、组建原则、组建方式与要求,明确了业主项目部工作职责及各岗位职责;明确了业主项目部重点工作与关键管控节点。

(2)专业管理要求。明确了业主项目部项目管理、安全管理、质量管理、造价管理、技术管理五个专业的管理工作内容及方法、管理流程、管理依据。

1)管理工作内容及方法。明确了业主项目部主要工作内容和基本方法,并标注了完成各项工作所采用标准化管理模板的编号,附录B中详细收录了业主项目部标准化管理模板(可登录国家电网公司内网“基建管理”专栏下载使用)。

2)管理流程。明确了业主项目部各专业管理重要单项业务的工作流程。

3)管理依据。主要标注了业主项目部各项工作所依据的国家、行业、国家电网公司有关法律法规、管理制度、技术标准等,对于规章制度、技术标准等不再列出文号,对于通知、文件等列出文号。除本手册已列出的管理依据外,国家电网公司已经颁布及即将颁布的基建相关管理制度等,也作为业主项目部各项管理工作的依据。

(3)评价机制。评价机制包含评价方法、评价标准、评价结果应用等内容,依据《国家电网公司业主项目部标准化管理办法》,明确了国家电网公司总部、省级公司基建部门对业主项目部的综合评价内容及相关要求;明确了业主项目部对相关参建单位的综合评价或履约评价内容及相关要求。

本手册还对有关名词术语进行了统一解释,详见附录A。

本手册中管理模板代码的命名规则:SZ代表业主项目部组建模板;XM代表项目管理模板;AQ代表安全管理模板;ZL代表质量管理模板;ZJ代表造价管理模板;JS代表技术管理模板;PJ代表评价机制模板,详见附录B。

本手册中管控记录表(GK×)内容模板参照附录C。


 发表于2016-04-21   |  只看该作者       筑龙币+20

3

点评   lujianming1  发表于  1楼   2016-04-17  国家电网公司业主项目部标准化管理手册2014.rar
谢谢了,收藏了

 发表于2016-04-24   |  只看该作者       筑龙币+10

4

谢谢分享

 发表于2016-10-12   |  只看该作者       筑龙币+10

5

 谢谢分享

 

 发表于2016-11-03   |  只看该作者       筑龙币+10

6

谢谢分享


 发表于2017-09-11   |  只看该作者      

7

不能下载

 发表于2017-09-11   |  只看该作者       筑龙币+10

8

谁给我一份,我给现金或充值点卡

 发表于2017-09-11   |  只看该作者      

9

点评   lujianming1  发表于  1楼   2016-04-17  
给我传一份2014版国家电网业主项目部标准化管理手册

 发表于2017-11-11   |  只看该作者      

10

不能下载

lujianming1

广东 广州 | 建筑施工

0 关注

999+ 粉丝

999+ 发帖

999+ 荣誉分

该博主未添加简介

猜你爱看

添加简介及二维码

简介

还可输入70字

二维码(建议尺寸80*80)

发站内信息

还可输入140字
恭喜您已成功认证筑龙E会员 点击“下载附件”即可
分享
入群
扫码入群
马上领取免费资料包
2/20