位置:美国
分类:国外景观项目
内容:实景照片
图片:15张
Silresim Superfund Redevelopment Study, Lowell, MA
StoSS, Boston, MA
Client: City of Lowell Division of Planning and Development
Displays considerable innovation. . . It is great to see a long-range, phase-in plan. . . Graphics beautifully portrayed for this important plan. . .
2004 Professional Awards Jury Comments
This project presents a strategy for the social, cultural, environmental, and economic recovery of an existing industrial corridor and highly contaminated Superfund site in Boston. Since the remediation and funding allocation processes are expected to continue for a number of years, the proposal envisions staging events over a period of up to 20 years. These tactics are designed to engage community participation, change public perceptions, generate broad-based interest in the urban landscape, increase political pressure, test proposed methods and strategies on limited sites, and to initiate a longer-term unfolding of improvements and developments. A proposed alternative stormwater processing system, which functions as a new type of ecological infrastructure, establishes a long-term physical framework for this recovery.
Silresim Superfund Redevelopment Study-2
Silresim Superfund Redevelopment Study-3
Silresim Superfund Redevelopment Study-4
Silresim Superfund Redevelopment Study-5
Silresim Superfund Redevelopment Study-6
Silresim Superfund Redevelopment Study-7
Silresim Superfund Redevelopment Study-8
Silresim Superfund Redevelopment Study-9
Silresim Superfund Redevelopment Study-10
Silresim Superfund Redevelopment Study-11
Silresim Superfund Redevelopment Study-12
Silresim Superfund Redevelopment Study-13
Silresim Superfund Redevelopment Study-14
Silresim Superfund Redevelopment Study-15
河北 秦皇岛 | 园林景观
3 关注
67 粉丝
999+ 发帖
4 荣誉分
∨
简介
二维码(建议尺寸80*80)