资料目录
- 施工大纲目录
- Contents of Construction Program
- 一、编制说明及编制依据General Instructions and Preparation Basis 1
- 1.1前言Preamble 1
- 1.2编制说明General Instructions 2
- 1.3编制依据Preparation Basis 3
- 二、工程概况Project Overview 3
- 2.1工程概况 Project Overview 3
- 三、施工准备Construction Site Preparation 4
- 3.1施工技术准备Technical Preparation for Construction 4
- 3.2施工准备Construction Preparation 5
- 3.3现场用水需求及布置方法Construction Water Demand and Layout 5
- 3.4现场用电需求及注意事项Construction Power Demand and Warnings 6
- 四、质量控制与保证措施Quality Control and Quality Ensuring Measures 7
- 4.1工程质量目标Project Quality Target 7
- 4.2质量管理体系Quality Management System 7
- 4.3质量预控及检测程序Quality Pre-control, Testing and Inspection 9
- 4.4质量保证措施Quality Assurance Measures 11
- 4.5各级人员质量责任Quality Responsibilities of All Levels of Personnel 29
- 4.6质量管理工作程序Quality Control Procedure 30
- 五、HSE 计划 HSE Plan 36
- 5.1安全方针 Policy for safety 36
- 5.2安全、文明施工目标 The target for safety and civilized construction 36
- 5.3安全组织机构 Organization of safety management 37
- 5.4人员职责 Responsibility 38
- 5.5人员健康 Workers’ health 41
- 5.6环境保护 Environment protection 41
- 5.7安全生产的主要措施 Main methods for safe construction 42
- 5.8文明施工 Civilized construction 46
- 六、主要施工方案及难点论述Main Construction Methods Statement 47
- 6.1总体指导思想及原则:General Guidelines and Principles 47
- 6.2框架结构施工方案Framework construction scheme 错误!未定义书签。
- 七、 工程项目施工目标Management Targets of This Project 103
- 八、材料的采购、检验和使用措施Purhasing, Inspection and Application of Materials 104
- 8.1材料的采购、检验和使用原则Principles of Purchasing, Inspection and Application 104
- 8.2材料使用管理Material Application Management 105
- 九、成品保护措施Protection Measures for Finished Work 105
- 十、 进度计划与控制措施10 Construction Schedule and Controlling Measures 107
- 10.1工程管理软件Project Management Software 107
- 10.2施工总进度控制计划表Master Construction Schedule 107
- 10.3保证工期的措施Measures Ensuring the Construction Schedule 108
- 10.4提高劳动力工作效率和措施Improve the work efficiency 116
- 十一、工程项目施工组织机构Proposed Project Organization Chart for Proposed Project Organization Chart for 89
- 十二、 施工机械设备计划Construction Machinery Plan 95
- 12.1土建工程主要施工机械配备Main Machinery and Equipments for Civil Works 95
- 12.2土建工程主要检测计量设备需用计划表Main Measuring Equipments for Civil Works 96
- 十三、劳动力计划Project Manpower Schedule 97
- 十四、例会及施工日志Regular Meeting and Construction Log 98
- 十五、竣工报告Project Completion Report 98
- 十六、回访服务Re-visiting Service After Project Completion 99
- 十七、施工现场临时布置图Temporary establi shment layout map 100
- 十八、结束语In Conclusion 102
内容简介
总体结构设计:矩形钢筋混凝土池,简要说明如下:
General Structure Design:Rectangle ferrconcrete pond Fence the general elucidation is as follows
1、砼强度等级:垫层为C10,底板及池碧为C30,混凝土抗渗等级S6;
Concrete strength grades:C10 concrete for bedding course, C30 for pond and S6 for resistant leakage degree
2、钢筋:采用HRB335和HPB235热轧钢筋。
Steel Bars: Hot-rolled HRB335 and HPB235 will be adopted.